Home
Work through one company at a time. Describe it, load its documents, assess them against the framework, then generate the optimised set.
Steps for this company
Saved companies
| Company | Location | Project value | Tier | Updated |
|---|
Company profile
Assumptions
Each value is derived from the company profile. Change any of them and every output updates. A changed value stays fixed when the profile changes, until you reset it.
Company requirements
Add this company's own rules, one per line. For example a board resolution, a lender covenant, a group policy or an operator requirement. They appear in section 14 of the framework.
Company documents
Load the company's existing policies, procedures, workflows, templates and organisation charts. The text is read in your browser, saved with the company when you press Save, and sent to Claude when you run an assessment or generate a document.
Add files
Drop files here, or choose them. PDF, Word (.docx), Excel, PowerPoint (.pptx), text, Markdown, CSV, or an image of a chart or workflow.
Old .doc and .ppt files are not read. Save them as PDF first. Images are used in this session only and are not saved.
Document library
| Document | Type | Used for | Size |
|---|
Or paste text
Assessment
Deep analysis reads each document on its own and in full, one Claude call per document, then combines the reviews. It keeps reviews already done, so it can be stopped and continued. Quick assessment sends all documents in one call and cuts long ones to fit.
Optimised document set
| Document | Company material it is built from | Status |
|---|
To change what a company document is used for, open its row on the Documents page.
Whole set
Document coverage
Every loaded document, whether it was considered in the optimised output, and why not where it was not.
| Document | Used for | Considered in | Status | Explanation |
|---|
Cost report
Report settings
Close period stores this forecast as the previous period for every package, raises the report number and clears the date and commentary.
Checks before issue
Summary by division
Commercial position and contingency
Packages needing attention
Commentary
Detail by cost structure line
Import from the Excel template
Cost structure
Packages
One row per contract package. Budget transfers, approved changes and pending variations come from the two logs and cannot be typed here.
Variations
One row per variation. Approved variations feed approved changes. Pending and anticipated variations feed the forecast at their assessed amount.
Budget log
One row per budget transfer, contingency drawdown or re-baseline. Budget revisions in the report come only from this log.
Workflow visuals
Each process drawn as a swimlane: one row per role, steps left to right, with decisions, branches and loops back, and the time limit under each step. The optimised workflow follows this company's profile and assumptions.
Boxes are steps and rounded boxes are end points. A diamond is a decision: follow the Yes or No label on each line leaving it. A dashed line running back along the top is a loop to an earlier step. A line running along the bottom skips ahead. Scroll sideways to see the whole flow.
Current workflow, from the company documents
Executive pack
Decisions required this month
In Present mode, use the arrow keys or the buttons. Press Escape to leave.
Industry template set
A ready-made set of 13 governance documents and 12 forms and registers for a resort or hospitality development. It is this platform's benchmark, built from the sources named in the framework and from general practice. It is not a certified industry standard.
Governance documents
| Document | Purpose |
|---|
Forms and registers
| Template | Use |
|---|
Whole set
Framework
The benchmark for this company, generated from its profile, assumptions and requirements.